    Nama Proyek                  : PLTU III Banten (3 x 350 MW)
    Lokasi                           : Teluk Naga, Tangerang, Indonesia
    Metode Pengembangan    : Vacuum Preloading, Vacuum Preloading with water surcharge, Vacuum Preloading with soil surcharge
 
    Nama Proyek                  : Summarecon Gading Serpong Estate
    Lokasi                           : Gading Serpong, Tangerang, Indonesia
    Metode Pengembangan    : Deep Vacuum Preloading
 
    Nama Proyek                  : PLTU I Pulang Pisau (2 x 60 MW)
    Lokasi                           : Pulang Pisau, Central Kalimantan, Indonesia
    Metode Pengembangan    : Vacuum Preloading, Vacuum Preloading with soil surcharge
 
    Nama Proyek                  : Tapin Coal Terminal
    Lokasi                           : Tapin, South Kalimantan, Indonesia
    Metode Pengambangan    : Vacuum Preloading, Vacuum Preloading with water surcharge
Beranda   |    Hubungi Kami
Hak Cipta © 2011, Dilindungi Undang-Undang  |  PT. SOILTECH  INDONESIA
Soiltech Indonesia - Spesialis Perbaikan Tanah
BERANDA        TENTANG  KAMI        TEKNIK        APLIKASI        AKREDITASI        KARIR        LINKS        HUBUNGI KAMI
PT Soiltech Indonesia - EPC Contractor Specializing in Soil Improvement